AC EV charging stations

Match the connection form to the parking space.

Compare AC charging equipment by connection form, site supply and operating requirements.

AC Charging Station Thunderbolt_800x800

Start with the connection experience.

AC Charging Station Thunderbolt_800x800

Thunderbolt

An AC wallbox family to discuss against the supply, mounting and access requirements of your site.

AC Charging Station

VoltWall

A socketed form keeps the vehicle cable separate from the wallbox. Consider who provides, stores and replaces that cable.

AC Charging Station Nightblade_800x800
Nightblade enclosure view

Nightblade

A tethered form keeps the charging cable with the parking position. Compare cable reach, storage and the driver’s connection routine.

Match the equipment to the site.

Electrical supply

Identify the supply voltage and phase, available capacity and the installation team’s circuit requirements.

Parking and cable route

Define vehicle positions, cable reach, mounting surface and everyday cable storage.

Access and operation

Decide who may charge, who manages access and whether the project requires a connected backend.

Plan around the way the parking space is used.

Workplace and visitor parking

Separate regular users from occasional visitors. Use arrival patterns and dwell time to define the charging brief.

Shared residential or commercial parking

Set out access, metering and operating responsibilities before selecting the configuration.

Confirm available control and connectivity options for the selected model and destination.

Bring the parking brief into the quotation.

Share the country, site type, number of charging positions, available supply and preferred connection form. Add access or backend requirements and any documents required for procurement.

Scroll to Top

Contact MegaEVSE